03.020.0221 Wall system | Stone veneer wall, transitional, w/ brick backing & struct. steel framing



This wall system illustrates an example of a mid to high-rise transitional, or hybrid masonry wall. This type of construction was common between 1890-1940 and varies widely as it was a part of the transition from mass masonry load-bearing wall construction to steel skeleton frame construction. In this example the steel structural system supports floor loads and is encased in concrete and a 12” multi-wythe brick wall with stone veneer that encloses the building. The 4” stone veneer is tied into the masonry by metal z-strap anchors and at the top course by a metal cramp whereas the common brick is used as the backing and predominant wall infill. The anchors engage with the veneer stone by penetrating a kerf or channel that is cut into the top surface of each panel. The mass of masonry deflects bulk water penetration but is understood to take on a percentage of moisture that is free to evaporate slowly from the mortar joints on either side of the wall over time.

Comments

Popular posts from this blog

01.030.0332 Base of Wall | Anchored Brick Veneer, CMU Backing, CMU Foundation

02.120.0215 Grout pour at top of concrete masonry wall

10.030.0733 Cornice and parapet rebuild | Terra cotta, extruded