01.410.0132 High lift grouting procedures

01.410.0132 High lift grouting procedures

This diagram illustrates high lift grouting procedures in the field of the wall. Vertical bars are spaced per structural design and reinforced cells are filled solid with grout. Horizontal bond beams are also spaced per design, and can be formed with standard open-cell CMU with cross webs knocked out to accommodate horizontal bar(s) and grout stop material below; or they can be constructed with solid-bottom U-block units notched to accommodate intersecting vertical bars. All cells with vertical reinforcement require 3" wide min. cleanout openings to validate grout placement. High lift grouting procedures apply to grout placed in pours and lifts exceeing 5'-4" but not to exceed 12'-8". Details that show different or modified concepts or methods can be of equal validity and should not be excluded from consideration. This detail shall not be used for construction without the approval an signature of a licensed design professional. The person using this detail shall be responsible for its complete design and proper application.

 

 

Comments

Popular posts from this blog

10.030.0633 Lintel rebuild | Terra cotta, extruded

10.030.0433 Sill and mullion rebuild | Terra cotta, extruded

06.080.0241R Interior wall retrofit | Tile over existing gypsum bd. on wood or steel studs, mortar bed